home *** CD-ROM | disk | FTP | other *** search
/ Hráč 2004 July / Hrac_71_2004-07_dvd.iso / dema / Americas Army 2_1 / armyops210.exe / BRIEFI~1.cab / pipeline_sf_team0.txt < prev    next >
Text File  |  2004-05-20  |  741b  |  15 lines

  1. Situation:  Terrorist forces have captured Alaskan Pipeline pump station at grid WA542679, with the intent
  2. of creating an environmental disaster.
  3.  
  4. Mission: ODA 20-2 will secure Alaskan Pipeline station at grid WA542679 and negate environmental threat by 
  5. accomplishing one of the following: secure main control panel; stop oil flow at the three valve controls.
  6.  
  7. ROE: Minimize damage to oil storage containers and pipes.
  8.  
  9. Enemy:  Enemy consists of a squad-sized terrorist force inside the main pump station.
  10.  
  11. Troops:  One Special Forces A Team.
  12.  
  13. Terrain:  Alaskan Pipeline Pump Station consisting of three structures; the pump station, the exterior oil
  14. tanks and a one story out-building housing the emergency shut off valve.  
  15.